Wronki, Poland (5,000 sqm) – 2013
The Samsung Electronics production facility in Wronki, Poland, is one of the most modern household appliance factories in Europe, built on an area of 336,000 sqm.
Municipal Installations:
» Sanitary sewerage
» Stormwater drainage system
» Outdoor hydrants
Interior Mechanical Installations:
» Geberit Pluvia stormwater collection system
» Daikin VRV system
» Sanitary installations
Fire Protection System Design and Execution:
» Sprinkler systems compliant with NFPA13
» Fire detection system
Electrical Installations Design and Execution:
» Grounding
» Lightning protection
» Interior and exterior lighting
» Electrical panels
Client: Samsung Electronics, Wronki, Poland
General Contractor: Tecton Polska, Poznan, Poland
Consultant: Hanmi Global, Seoul, South Korea







